ISLAMABAD: Gwadar Turbat Hoshab section is part of the 892 kms long Gwadar Ratodero Motorway (M 8) project which is an important link of China Pakistan Economic Corridor is being completed with the approximate cost of Rs.12 billion.
The M 8 being developed with the long term objective to connect Gwadar Port with the upcountry and further with Afghanistan and China.
The 47 km stretch starting from Gwadar up to Nalient overlap Makran Coastal Highway and was completed earlier.